The San Diego-Coronado Bridge opened August 3, 1969, replaced the ferry and curves 80 degrees to clear Navy ships; tolls of 60 cents ended in 2002.
San Diego's best-known piece of infrastructure is a bridge that bends. The San Diego-Coronado Bridge carries State Route 75 across the bay from the Barrio Logan side of the mainland to Coronado in a long, graceful curve that makes the structure look more like a ribbon than a road. Nobody drew that shape for its looks. It answers an engineering problem. The Navy needed ships to pass under the span, so the bridge had to rise to a height of 200 feet at the center, and to climb that high without an impossibly steep grade the roadway had to wind.
Every number on the bridge has a reason. Here is a tour of them: the dimensions, the politics, the construction and the fifty-odd years of history since.
The numbers
The bridge is a prestressed concrete and steel girder structure. The main figures:
- Total length: 11,179 feet, about 2.1 miles, including the approaches.
- Clearance: 200 feet above the water, set so Navy ships can pass beneath.
- Longest span: 660 feet, in a structure with 32 spans in all.
- Piers: 21 in the water.
- Width: 63 feet between the curbs, carrying five lanes of State Route 75.
- Grade: The roadway climbs from Coronado at a 4.67 percent grade.
- The curve: It turns through 80 degrees as it heads toward San Diego, which lengthens the route and keeps the climb gradual.
The east end meets Interstate 5 at a T interchange southeast of downtown San Diego. I-5 and I-805: two freeways, one split at the border covers the freeway system around it.
Why 200 feet
The height is the heart of the story. San Diego Bay is a Navy harbor, with Naval Base San Diego on its eastern shore and Naval Air Station North Island on the peninsula at Coronado. Aircraft carriers and other large ships use the channel, so any bridge across the bay had to leave them room. In 1964 the Navy backed a bridge, provided it had the required clearance. That condition set the 200-foot figure.
Reaching that height from the Coronado side took length. A 200-foot rise at a steady 4.67 percent grade needs about 4,300 feet of roadway, since 200 divided by 0.0467 is roughly 4,283, and the curve supplies it without running the bridge in a straight line across the bay. Bending the roadway 80 degrees added distance and made the climb gentle enough for ordinary traffic. The Navy's need and the geometry together explain the shape. The Navy as San Diego's largest employer describes the military presence that made the clearance non-negotiable.
The long road to a bridge
Coronado's link to the mainland began with a ferry. For decades the only way across was by boat, and the ferry was both a convenience and a bottleneck. Proposals for a bridge are almost as old as the hotel on the island. In 1926 John D. Spreckels proposed one, but voters rejected the plan. Hotel del Coronado, 1888 tells how the resort Spreckels owned shaped the peninsula.
The idea came back after the Second World War. In 1951 and 1952, Coronado's City Council began feasibility studies. The Navy's support in 1964 cleared the way. Construction began in February 1967, with the builder Murphy-Pacific doing the work. The project used about 20,000 tons of steel and 94,000 cubic yards of concrete. The principal architect, Robert Mosher, specified an orthotropic deck, a design in which the steel deck plate itself works as part of the structure, which was new to the United States at the time. The original cost was $48 million.
Opening day, August 3, 1969
The bridge opened on August 3, 1969, during the celebration of San Diego's 200th anniversary, which marked 1769, the year of the first Spanish settlement. The timing tied a modern structure to the city's origin. It replaced the San Diego and Coronado Ferry, which had served the route for generations.
In 1970 the American Institute of Steel Construction gave the bridge an award of merit. For a time it held a world distinction as well: it was the longest continuous box girder bridge until 2008, when a Chinese bridge over the Yangtze River surpassed it.
Tolls: 60 cents to zero
The bridge was built as a toll bridge, and its tolls make a small economic history.
| Year | Toll |
|---|---|
| 1969 | 60 cents each way |
| 1980 | $1.20, westbound only |
| 1988 | $1 |
| June 27, 2002 | Tolls end |
Tolls ended on June 27, 2002, at 10 p.m. The bridge was the last toll bridge in Southern California to stop charging. Over the years drivers paid about $197 million in total, more than four times the original $48 million construction cost.
How the roadway works
The bridge carries two lanes in each direction plus a reversible middle lane controlled by a barrier transfer machine, installed in 1993. The reversible lane lets traffic engineers add capacity in the direction of heaviest flow. About 75,000 vehicles used the bridge a day in 2009.
There are no sidewalks, bike paths or shoulders. Once a year, the bridge becomes something else: the Navy Bay Bridge Run, held since 1986, opens the span to pedestrians, and Bike the Bay, since 2008, opens it to cyclists. Those are the occasions when people can cross without a car. On the Coronado side, traffic barriers on Third Street were removed in 2004, and the speed limit there dropped to 25 miles an hour in 2005.
The pillars and Chicano Park
The bridge changed a neighborhood, too. Its approach ramps and pillars cut through Barrio Logan, a Mexican American community already divided by Interstate 5. In 1970, residents occupied land beneath the structure to stop a parking lot and a highway patrol station, and that protest created Chicano Park. The murals now covering the bridge's eastern support pillars are part of that park, and they form one of the largest collections of Chicano murals in the world. Permission to create the park came in 1973. A guide to the Chicano Park murals is a walking guide, and Barrio Logan describes the area.
Lighting and a legend
A project to light the bridge has been a long time coming. In 2010 the Port of San Diego chose a design by the London-based Peter Fink's group, using programmable LED lighting powered in an energy-neutral way by wind turbines. The goal was to finish by 2019, the bridge's 50th anniversary. From November 8 to 14, 2020, three columns were lit as a field test.
Then there is the popular story that the center span was built to float away in an earthquake, so Navy ships could clear the debris after a collapse. It is false. Caltrans and the architect have both said so. The bridge is a conventional structure, built to carry traffic and to give ships clearance.
Safety and the barrier question
The bridge has a hard side. It is a place where people have died by suicide, and after a 2016 crash that killed four people in Chicano Park, Caltrans studied safety options. A March 2018 report laid out possibilities such as netting, fencing and glass barriers. If you or someone you know is thinking about suicide, the 988 Suicide and Crisis Lifeline takes calls and texts at 988.
The bridge in dates
- 1926: John D. Spreckels proposes a bridge; voters reject it.
- 1951 to 1952: Coronado's City Council begins feasibility studies.
- 1964: The Navy backs a bridge with the clearance it needs.
- February 1967: Construction begins.
- August 3, 1969: The bridge opens during the city's 200th anniversary.
- 1970: The American Institute of Steel Construction gives it an award of merit; residents take over the land that becomes Chicano Park.
- 1973: Permission to create Chicano Park is granted.
- 1980 and 1988: Toll changes: $1.20 westbound only, then $1.
- 1986: The Navy Bay Bridge Run begins.
- 1993: The barrier transfer machine for the reversible lane is installed.
- June 27, 2002: Tolls end at 10 p.m.
- 2008: A Chinese bridge passes it as the longest continuous box girder.
- 2010 to 2020: Lighting design chosen, then a three-column test in November 2020.
What a box girder is
"Continuous box girder" sounds technical, so here it is in plain terms. A girder is the main beam that carries a bridge's roadway. A box girder is shaped like a hollow rectangle, strong for its weight because its walls resist bending and twisting. A continuous girder runs unbroken across several supports instead of being a series of separate short beams, which spreads the load and reduces stress at each joint.
At 11,179 feet, about 2.1 miles, the Coronado bridge's continuous girder was the longest of its kind for nearly four decades. That is the record that lasted until 2008. The orthotropic deck, where the steel plate of the roadway is stiffened with ribs and acts as part of the structure, is the other major engineering feature, and it let the designers build a lighter, longer span. The result carries heavy traffic on a slender profile.
Where to see it
The bridge looks different from every angle, and a few spots are worth knowing.
- From below, in Chicano Park. Standing among the pillars gives the best sense of the structure's scale and of the murals covering its piers.
- From the downtown waterfront. The Embarcadero has a view of the span arching against the sky, with Navy ships passing beneath.
- From Coronado. The Coronado side looks back across the bay to the downtown skyline, and the ferry landing is a place to watch boats.
- From the road itself. Driving over, the curve and the height are most apparent. Passengers get the better view.
Before and after the bridge
The ferry the bridge replaced had linked the island and the downtown waterfront for decades, and a ferry still runs between them today, which gives travelers a choice. The difference is practical. A ferry runs on a schedule and carries people across in a short ride, while the bridge is a highway that carries cars at all hours. coronado by bridge or ferry weighs the two against each other.
The island changed after 1969. Coronado had been a place where the ferry set the pace; with the bridge, it was a short drive from the freeway. The city's population, 20,192 in 2020, is small next to San Diego's, but the bridge made the peninsula part of the region's daily traffic. Naval personnel, hotel staff, residents and visitors all use it, and the roughly 75,000 vehicles a day counted in 2009 show how central it has become.
Crossing it today
Today the bridge is the main road link to Coronado, along with the Silver Strand highway to the south and the ferry. coronado by bridge or ferry compares the ways across, and Coronado describes the city at the other end. For a driver the crossing is brief and the view is memorable: the downtown skyline to the north, the shipyards and Navy ships below, North Island and the Pacific ahead.
For all its complexity, the bridge is a lesson in how geography shapes what a place builds. The 200-foot clearance, the 80-degree curve and the 11,179 feet of length all come from one fact: San Diego Bay is a working harbor, and the bridge had to let it keep working.