The city is building a plant that turns recycled water into drinking water. Here is how the five steps work, where the water goes and what the 2035 goal means.

What goes down the drain in San Diego is about to come back as a water supply. The program is called Pure Water San Diego, and its stated goal is to provide nearly half of the city's water locally by the end of 2035. The city's wastewater is treated, as it always has been. Then, instead of running out to sea, part of it gets cleaned further to a drinking-water standard and sent into a reservoir that already holds the city's drinking water. The idea is easy to state, hard to build and easy to misunderstand. Here it is in order: what it is, how it works, what is going up and what it will and will not change.

The idea in one paragraph

Most of San Diego's water is imported, as a thirsty city, from the 1944 aqueduct to imported water explains, and that dependence is a risk. Pure Water cuts into it by creating a supply the city controls. Recycled water from the city's own sewers is purified with advanced technology, piped to a reservoir, blended with other water and treated again before it reaches a tap. The city's materials describe the result as a local, drought-resilient supply. The sewers fill every day whatever the weather, so the source does not depend on rainfall or on the Colorado River.

How the water is cleaned

The city's purification process has five steps, and each does a different job.

  1. Ozonation. Ozone gas is bubbled through the water. It breaks down organic compounds and disinfects.
  2. Biological activated carbon filters. The water passes through beds of carbon where beneficial microorganisms consume remaining organic matter.
  3. Membrane filtration. Very fine membranes filter out particles and microorganisms.
  4. Reverse osmosis. Pressure pushes the water through a semipermeable membrane that removes extremely small compounds, including dissolved salts. In the city's pilot studies, reverse osmosis removed more than 95 percent of the monitored constituents.
  5. Ultraviolet light with advanced oxidation. The last barrier combines ultraviolet light and hydrogen peroxide to produce reactive molecules that break down any trace contaminants left.

It takes five steps because no single one removes everything. Each catches what the one before can miss, and together they produce water that meets drinking-water standards. Earlier demonstration work in San Diego used a shorter chain of membrane filtration, reverse osmosis and ultraviolet treatment, and the full-scale program uses the longer one.

Where the water goes

Purified water does not go straight to a faucet. It is piped to Miramar Reservoir, where it is stored and blended with San Diego's imported water. From there the blended water is treated again at the Miramar Water Treatment Plant before it enters the distribution system. This arrangement is called reservoir augmentation: the reservoir acts as a buffer and a second barrier, and the water goes through the same conventional treatment that every other drop of the city's supply goes through.

You may have heard the nickname "toilet to tap," which opponents of earlier reuse proposals used. It is memorable and badly misleading. The water in question is the output of a treatment train designed to produce drinking water, then diluted in a reservoir and treated again. It is closer to how many river-fed cities get their water, since the water those cities draw from rivers often includes treated wastewater from communities upstream.

What is being built

Phase 1 of Pure Water consists of 12 projects, and the city's target for the phase is 30 million gallons a day of purified water. Construction is under way in several parts of the city: Morena, Bay Park, Bay Ho, Clairemont, University City, Miramar and Scripps Ranch. The main projects include:

  • North City Water Reclamation Plant. Early works, an expansion and a flow equalization basin at the existing plant that treats the city's wastewater.
  • North City Pure Water Facility and Pump Station. The new plant where the advanced purification takes place.
  • Morena Pump Station and pipelines. A pump station and pipelines that carry wastewater north to the reclamation plant, with tunnels on the northern alignment. The pump station is at Sherman and Custer streets.
  • North City Pure Water Pipeline. The line that carries purified water to Miramar Reservoir, including a dechlorination facility and an underwater pipeline.
  • Miramar Reservoir. Pump station improvements and an automated system for monitoring water quality in the reservoir.
  • Related improvements, including work at the Metropolitan Biosolids Center and an oxygenation system at the Peñasquitos Pump Station.

Pure Water is not a single plant but a network. Wastewater has to be moved to the right place, treated, purified, piped and monitored, and every link in that chain has to be built. Much of the digging is underground, which is why residents along the route have seen road work. The city offers an interactive map of road work and closures and a sign-up for construction updates.

As of the first quarter of 2026, the North City Pure Water Facility and pump station project was reported to be about 90 percent complete and was shifting to testing and preparing its systems. Earlier schedules had expected Phase 1 to be operating sooner, and the timeline has slipped.

A scale check

What does 30 million gallons a day mean? One acre-foot of water, the amount that would cover an acre of land a foot deep, is about 325,851 gallons, and it is the unit water agencies use for annual supply.

  • 30 million gallons a day times 365 days is 10,950 million gallons, or 10.95 billion gallons a year.
  • 10.95 billion divided by 325,851 is about 33,600 acre-feet a year, if the plant ran at full capacity all year.

That is the nominal output of Phase 1. It is a big number, and still only part of the goal, since "nearly half" of the city's supply takes more capacity than Phase 1 alone. The next phase is part of that plan. It has been described as a central-area facility sending purified water to San Vicente Reservoir or Lake Murray, and city documents give different capacity figures for it. The program's target date remains the end of 2035.

Why a city does this

Four reasons stand out.

  • Reliability. A local source is not exposed to the shortages that can hit imported water. The Colorado River is shared among seven states and its supply has been under stress. See Where San Diego gets its water.
  • Control. The city controls the plant, its schedule and its costs, as it cannot control the price of imported water.
  • Drought resilience. Wastewater is produced every day. Rainfall in San Diego varies, averaging about 9.8 inches a year, and the city's reservoirs depend on it. the nine reservoirs and three treatment plants covers the local storage system.
  • Using what is already there. Treated wastewater that would otherwise be discharged becomes a resource.

None of this makes the program free or simple. It is a large public works project, and Public Utilities' ratepayers fund it. The department's rate information is public, and San Diego Public Utilities Department describes the department.

What residents will notice

For most customers, nothing visible changes. The water at the tap will be treated to the same standards and will come through the same system. A few things will show.

  • Construction. Where pipelines and tunnels are going in, expect road work and detours. The city's map and update sign-up are the best sources.
  • Rates. Water rates reflect the cost of the supply, and Pure Water's costs are part of the picture.
  • Questions. The program line is 619-533-7572 and its email is [email protected].

New customers and people moving within the city can open or close an account through Public Utilities; see Starting water and power service in San Diego. Much of the construction is in neighborhoods that include University City and Clairemont.

Questions people ask

Will this replace imported water? Not entirely. The goal is nearly half of the city's supply, not all of it, and the Colorado River water that arrives through the aqueduct system will stay part of the mix.

Does the purified water go straight into pipes? No. In the design the city describes, it goes to Miramar Reservoir first, is blended with other water and is treated again at the Miramar Water Treatment Plant.

Why is the Miramar reservoir the destination? It is an existing reservoir that already holds water for the city's treatment plant, so the purified water can enter the system through infrastructure already in place. An automated in-water quality system, part of the program, monitors the water at the reservoir.

Where can I follow construction? The city's Pure Water pages carry an interactive map of road work and closures, a construction-update sign-up and a program calendar. Questions go to 619-533-7572.

Is this a one-time project? No. Phase 1 is the first of a planned sequence, and the schedule through 2035 covers a further phase. Plans of this size change as designs mature and as costs and schedules are updated, so the city's pages are the place to check current status.

Reading the 2035 goal

"Nearly half by the end of 2035" is a goal, not a promise, and it pays to read it carefully. It describes a share of the city's water supply, not of the whole region's. It depends on both phases of the program being built and operated, and it assumes the plant works as designed. The date has already moved once for Phase 1.

What can be said with confidence is that the project is real, large and under construction, and that it marks a change of direction: from a city whose water arrives from hundreds of miles away to one that recycles a meaningful share of what it already has. By the time the goal date arrives, a San Diegan turning on a tap may be drinking water that began in the sewers and was treated five ways. It takes some getting used to. The alternative, a city that depends mostly on other regions' water, is a harder bargain.