Blog
Adding a companion unit: the permit path
San Diego's rules for a companion unit (ADU) or junior unit: sizes, how many, parking, the 31-day rental rule, pre-approved plans and the steps to a permit.
A bedroom over the garage, a cottage at the back of the lot, a converted room with its own door. Putting a second home on a lot sounds simple. The rules are not. San Diego calls such a unit a companion unit, and the state calls it an accessory dwelling unit, or ADU. A smaller version built inside an existing house is a junior accessory dwelling unit, or JADU. The city's Development Services Department runs the permit process, and the Planning Department writes the land-use rules.
This how-to goes through the sizes, the limits, the parking and rental rules, the shortcut that comes with pre-approved plans and the steps to apply. It is general information. The city's own ADU page is the authority and it changes, so read it before you spend money.
The two kinds of unit
The city's page defines the two types this way:
| ADU (companion unit) | JADU (junior unit) | |
|---|---|---|
| Size | 150 to 1,200 square feet | 150 to 500 square feet |
| Form | Converted, attached or detached | A conversion of, or attached to, an existing or proposed dwelling unit |
| Where | Single, multiple and mixed-use zones and Planned Districts Ordinance zones | Single-residential zones only |
| How many | 2 in single-dwelling zones; 2 or more in multiple-dwelling zones | 1 |
An ADU is a complete, independent home with its own living facilities for one or more people. A JADU is smaller and sits inside, or attached to, a dwelling. The bigger, detached options are what most people picture when they say "granny flat" or "backyard cottage."
Rules that apply to both
Rental term. An ADU or JADU may not be used for a rental term of less than 31 consecutive days. That rules out a short-term rental. Anyone interested in short-term rentals needs a license under a different ordinance, covered in How San Diego sorted short-term rentals into four tiers.
Owner occupancy. For a JADU, the unit or the single-family residence must be owner-occupied if the JADU shares sanitation facilities with the existing structure. The city lists a JADU agreement, form DS-202A, among its resources.
Parking. New ADUs generally need no parking. The exceptions: garage conversions in the Beach Impact Area of the Parking Impact Overlay Zone outside a Transit Priority Area, and bonus and affordable ADUs outside a Transit Priority Area, which need one off-street space each. JADUs need no parking.
Height and setbacks. In single-dwelling zones, an ADU may not exceed two stories. Side and rear setbacks are not required for a structure under 16 feet tall outside Very High Fire Hazard Severity Zones. Taller ADUs, or any ADU in a Very High Fire Hazard Severity Zone, need a four-foot side and rear setback.
Solar. Newly built detached ADUs must provide solar panels under the California Energy Code. JADUs do not.
The ADU bonus program
The city also runs a bonus program. In a Sustainable Development Area, a property owner may build one non-deed-restricted bonus ADU for each qualifying on-site deed-restricted ADU. The deed restriction covers very low-, low- or moderate-income households for 15 years. Outside those areas, the maximum is one bonus ADU. An accessible bonus ADU may be available if two affordable ADUs are provided, and it must meet Chapter 11A of the California Building Code.
Say an owner in a Sustainable Development Area builds two ADUs and deed-restricts one of them for 15 years to low-income households. That owner qualifies for one bonus ADU with no deed restriction. The arithmetic is one for one, and it is the trade the program offers: an income-restricted unit buys an unrestricted one. The city's zoning portal, ZAPP, shows whether a parcel is in a Sustainable Development Area or in the Coastal Overlay Zone.
The shortcut: pre-approved plans
The city accepts pre-approved plans under state law. The plans on its list are the County of San Diego Standard ADU Plans, the City of Chula Vista Standard ADU Plans and the City of Encinitas Permit-Ready ADU Plans. An application that uses these plans gets a 30-day review. A few cautions apply:
- You must contact the plan provider directly to find out the licensing cost.
- The plans must meet the codes in effect at the time you submit.
- A pre-approved plan still needs a building permit, and the site still has to fit the plan.
For many owners, pre-approved plans trim design cost and review time. They also limit design choices, so the question is whether a standard plan suits the lot.
The steps
The path, in order:
- Check your zone. Look up your parcel in the city's zoning portal, ZAPP, to see the zoning, whether it is in a Sustainable Development Area and whether it is in the Coastal Overlay Zone.
- Choose the type. Decide whether you want an ADU, a JADU or both, and check how many your zone allows.
- Decide on plans. Choose a custom design or a pre-approved plan.
- Check the special cases. If your property is in the Coastal Overlay Zone, follow the separate Coastal ADU page. If it is in a Very High Fire Hazard Severity Zone, the setback rules change.
- Apply for a building permit. The city's page says there are no exemptions: every ADU needs one. The permit type depends on the number of units, either a Combination Building Permit or a Building Permit. Apply through the Building Permit page on the Development Services Department site.
- Pay the fees. The construction permit fee schedule is in Information Bulletin 501.
- Build and inspect. Work proceeds under inspection.
Review time depends on the project, and the city keeps a current permitting process timeline page. The general guide is in Getting a building permit in San Diego. The department's portal and Accela system handle applications, and its phone is 619-446-5000. Counters are open 7 a.m. to 4 p.m. Monday through Thursday and 10 a.m. to 4 p.m. Friday, closed from 11:30 a.m. to 12:30 p.m. daily, with no walk-ins after 3 p.m. The department's role is described in Development Services Department.
Where the Planning Department comes in
Development Services handles permits. The Planning Department, at 619-235-5200, writes the policies. The city has 52 community planning areas covered by 49 community plans, and a project's zoning and plan designation come from them. The department's role is in Planning Department.
Costs, and what to ask early
Total cost depends on the design, the site and what the lot needs, and the city's fee schedules cover the permit side. Before you hire anyone or buy plans, put these questions to yourself:
- Is the lot zoned for the unit you want?
- Does the lot fall in a Coastal Overlay Zone or a Very High Fire Hazard Severity Zone?
- Do you want to rent the unit? If so, it must be a rental of 31 days or more.
- Would a pre-approved plan fit?
- What are the fees in Information Bulletin 501?
- Does the property have a deed or homeowner association rule the city does not control?
Three hypothetical lots
These are illustrations of how the rules read, not advice for any property.
Lot A: a detached cottage. The owner of a single-dwelling lot wants a detached 800-square-foot unit behind the house. That is inside the 150-to-1,200-square-foot ADU range. In a single-dwelling zone the page allows two ADUs and a JADU, so one is within the limit. A new ADU generally needs no parking. If the cottage is under 16 feet tall and the lot is outside a Very High Fire Hazard Severity Zone, no side or rear setback is required; if it is taller, or the lot is in such a zone, a four-foot side and rear setback applies. As a new detached unit it must have solar panels. The owner needs a building permit, and could use a pre-approved plan for a 30-day review.
Lot B: a junior unit inside the house. An owner wants to turn a 400-square-foot part of the house, with its own entrance, into a unit. That fits the JADU range of 150 to 500 square feet, and a JADU must be a conversion or attached, which this is. If the unit shares a bathroom with the main house, the owner must live there. The unit cannot be rented for fewer than 31 consecutive days, and no parking is required.
Lot C: a multi-family lot. On a lot in a multiple-dwelling zone, the page allows two or more ADUs. A JADU is not allowed there, because JADUs are limited to single-residential zones.
In each case the next step is the same: check the parcel in ZAPP and apply through the Building Permit page. Setbacks, fire zones and the coast can change the details, so the project's own record decides.
The ADU in the housing picture
Companion units are one answer to a housing shortage that shows up in the numbers. The city's budget reports a 12-month average median home price of $947,375 in 2025 on 10,912 sales, and unemployment of 3.8 percent in May 2026. A unit added behind an existing home is a modest bump in supply, and it can house a family member, a tenant or the owner's own household in a smaller place. The rules the city has written, the 31-day rental rule, the owner-occupancy rule for shared-bathroom JADUs and the parking exemptions, are the balance between adding units and protecting neighborhoods.
The same supply questions sit behind other topics here, among them the rental business tax, covered in the rental-unit business tax, and the city's rental guide Renting in San Diego and the offices to know.
Why the rules exist
San Diego has been trying to add housing in neighborhoods where land is expensive and mostly built out, and ADUs are one of the few kinds of housing a single homeowner can add without a large development. The state has passed laws that limit how much a city can restrict them, and the city's rules follow. The city's housing situation is part of the larger story told in What a $947,375 median home price means for a San Diego buyer: the 12-month average median home price in 2025 was $947,375.
Questions people ask
Can I rent my ADU on a short-term basis? No. The rental term must be 31 consecutive days or longer.
Do I need a permit for a small ADU? Yes. The city says there are no exemptions.
Do I need to provide parking? Generally not for a new ADU, with the exceptions listed above.
Can I build two ADUs? In single-dwelling zones, the page allows two ADUs and one JADU. Multiple-dwelling zones allow two or more ADUs.
Where do I start? With the city's ADU page and the zoning portal.
The city's guide to the process is in Adding an accessory or junior unit in San Diego.